Dubai, United Arab Emirates

Dubai · Photo: Robert Bock, CC0 1.0, Wikimedia Commons

Dubai (UAE)

Diesel generators for Dubai and the UAE: 230/400 V 50 Hz; radiator, filters and canopy for summers above 45 °C, high humidity and sand. 10–4,125 kVA.

Request a quote

Contact us directly

Call +90 216 634 34 06WhatsApp +90 533 582 26 50

Your request has been received. We will contact you as soon as possible.

Could not send. Please try again or call us. You can also reach us directly: WhatsApp +90 533 582 26 50 · info@terexdiesel.com

Too many submissions in a short time. Please try again in a few minutes.

Phone or email (one is enough)

Terms for sales outside Türkiye

  • Dispatch

    Models in stock: 2–3 business days; Perkins, Cummins, Volvo, Kubota, Scania and FPT Iveco: 3–4 weeks after order.

  • Warranty outside Türkiye

    12 months or 1,000 operating hours for all engine brands.

  • Certificates

    ISO 9001 · CE · TSE-HYB

  • Export documents

    A commercial invoice and packing list are prepared; a certificate of origin and any other documents the buyer requires are issued on request.

Export Process and Payment

Secure purchase process

From company verification to the loading video: every step in writing.

  1. Company verification
  2. Proforma invoice
  3. Order confirmation
  4. Live factory video call
  5. Your set’s serial number
  6. Pre-shipment inspection
  7. Signed test report
  8. Payment and loading approval
  9. Loading video and documents

See the full process

In Dubai the temperature goes above 45 °C in midsummer; on the coast, high humidity is added. Around the city, fine sand is everywhere. For a generator, these three together make a tough working environment. The grid is 50 Hz, 230/400 V, directly compatible with the 50 Hz / 1,500 rpm ratings in our catalogue. The real question is how much power the set will deliver in this heat.

45 °C and above

The power ratings in our catalogue are for standard conditions. In a Gulf summer the same set does not deliver the same power: the engine produces less power in thin air, and the radiator struggles to reject heat. That is why we ask for the highest temperature on site, choose the radiator for it and move up one rating if needed. We explain the logic of the calculation in power loss with temperature and altitude.

On sets installed on a roof or in an enclosed room, the air inlet and outlet paths must be separated so that hot air does not recirculate.

Sand and humidity

Sand fills the air filter quickly. We upgrade the filtration and advise more frequent filter checks. The canopy must keep sand out but still allow enough airflow. On the coast, humidity and salt call for surface protection and moisture protection for the alternator and panel.

High-rises, data centres, construction sites

In Dubai, generator requests mostly come from three types of project:

  • High-rise and commercial buildings: backup power for lifts, fire pumps and emergency lighting. The ATS panel brings the set online automatically during an outage.
  • Data centres and critical facilities: several sets run in parallel with a synchronization panel; while one set is in maintenance, the others carry the load.
  • Construction sites: the set runs all day and is selected on prime power. For portability we ship trailer-mounted generators, and for night work light towers.

Hotels, hospitals, industrial plants and telecom stations are also common places for generators.

Fuel and installation location

In high-rise buildings the generator often sits in the basement, on a mechanical floor or on the roof. Each location has its own question: air inlet and exhaust route in the basement, weight and vibration on the roof, noise on a mechanical floor. Fuel is usually pumped from a separate main tank to a day tank. Tank volume, location and fire precautions are set by local regulations; that is why it is best to make these decisions together at the building’s design stage. We cover the general rules of installation in our article on generator rooms and installation.

Shipping and quote

The sets leave Türkiye usually by sea in a container. Each one passes a full-load test before it leaves the factory. A commercial invoice and packing list are prepared; a certificate of origin and any other documents the buyer requires are issued on request.

For a quote, give us the power, standby or prime, highest temperature on site, installation location (roof, enclosed room, open area), canopy and panel preference, and the fuel tank. Request a quote.

Generator sets being loaded onto a curtain-side trailerGenerator set being loaded with a forklift

Lead time, documents and warranty

Lead time
Sets with Quartz, SDEC and Baudouin engines: 1–3 weeks after order confirmation, depending on stock. Sets with Perkins, Cummins, Volvo Penta, Kubota, Scania and FPT Iveco engines: 3–4 weeks after order confirmation. Sets with Kofo or Yuchai engines: 1–2 weeks after order confirmation. Transport time is added and depends on the route.
Export documents
Each shipment goes with the datasheet, factory full-load test report, commercial invoice, packing list and certificate of origin. Other documents required in your country are prepared on request.
Warranty
12 months or 1,000 operating hours, for all engine brands.
Factory visit
You are welcome to visit our factory in Tuzla, Istanbul, to see production and the full-load test bench before you order. Contact us to arrange a date.

Gulf Countries

Request a quote for Dubai (UAE)

Tell us the power, duty, voltage, enclosure and panel you need, plus the site temperature and altitude, and we will work out the right configuration with you.

Request a Quote+90 216 634 34 06WhatsApp

Frequently asked questions

What voltage and frequency should a generator in Dubai have?

The United Arab Emirates grid is 50 Hz, 230/400 V. The 50 Hz / 1,500 rpm ratings in our catalogue match this grid directly; we confirm the site voltage at the quotation stage.

Why does a generator lose power in the Gulf heat?

Hot air is thin; the engine takes in less oxygen and the radiator struggles to reject heat. On a set that will run above 45 °C this loss is significant. We choose the radiator for the highest temperature and move up one rating if needed.

How is a generator planned for a data centre or a high-rise building?

For critical loads, several sets run in parallel with a synchronization panel (N+1), and the ATS panel transfers the load automatically when the mains fails. The set location, exhaust route, air inlet and fuel tank should be decided at the building's design stage.