Kyrenia, Northern Cyprus

Kyrenia · Photo: Seksen iki yüz kırk beş, CC BY-SA 4.0, Wikimedia Commons

Northern Cyprus

Diesel generators for Northern Cyprus: 230/400 V 50 Hz; 10–4,125 kVA sets for Nicosia summers above 40 °C, salty coastal air and hotel season load.

Request a quote

Contact us directly

Call +90 216 634 34 06WhatsApp +90 533 582 26 50

Your request has been received. We will contact you as soon as possible.

Could not send. Please try again or call us. You can also reach us directly: WhatsApp +90 533 582 26 50 · info@terexdiesel.com

Too many submissions in a short time. Please try again in a few minutes.

Phone or email (one is enough)

Terms for sales outside Türkiye

  • Dispatch

    Models in stock: 2–3 business days; Perkins, Cummins, Volvo, Kubota, Scania and FPT Iveco: 3–4 weeks after order.

  • Warranty outside Türkiye

    12 months or 1,000 operating hours for all engine brands.

  • Certificates

    ISO 9001 · CE · TSE-HYB

  • Export documents

    A commercial invoice and packing list are prepared; a certificate of origin and any other documents the buyer requires are issued on request.

Export Process and Payment

Secure purchase process

From company verification to the loading video: every step in writing.

  1. Company verification
  2. Proforma invoice
  3. Order confirmation
  4. Live factory video call
  5. Your set’s serial number
  6. Pre-shipment inspection
  7. Signed test report
  8. Payment and loading approval
  9. Loading video and documents

See the full process

In Nicosia the temperature often goes above 40 °C in July and August. On the coast, humidity and salt are added to the heat. Most generator requests on the island also come for buildings that will see their highest load in exactly these months: hotels, residential complexes, hospitals, campuses.

The summer load decides

In Northern Cyprus a building’s electrical load changes a lot between winter and summer. When we size the set, we look at the busiest summer evening, with the air conditioners, kitchen, lifts, pool and water pumps all running together. We also add the start of the largest motor. For a first estimate you can use our power calculator.

In facilities where the load changes this much with the season, we recommend running two sets in parallel with a synchronization panel instead of one large set. In winter one set is enough, in summer both run together; and during maintenance the building is not left in the dark.

In hot weather the engine loses power and the radiator works harder. We choose the radiator for the highest temperature on site. The details are in power loss with temperature and altitude.

Salt

On a set a few hundred metres from the sea, salt air acts slowly but constantly on metal surfaces and the canopy. Corrosion-resistant surface protection, a good position and regular maintenance extend its life.

Noise

In hotels and residential complexes, the generator noise must not disturb the surroundings; that is why a soundproof canopy is used in almost every project. The ATS panel starts the set automatically when the mains fails, transfers the load, and returns the load to the mains when it comes back.

Pre-season test

A backup generator can stand for months without running. Problems usually show up at the worst moment, in August: a flat battery, stale fuel, a dried-out seal. Before the season starts, we recommend running the set under real load or with a load bank, and checking the battery and fuel. Sets that run for long periods at low load can also build up deposits in the exhaust; a test under load clears these too. The details are in our load bank test article.

Other applications

Commercial buildings, construction sites, telecom stations and agricultural irrigation are also common uses for generators. For construction sites we also ship trailer-mounted generators and light towers. For sets that will run continuously, the selection is made on prime power.

Grid, shipping, documents

The grid is 50 Hz, 230/400 V, directly compatible with the 50 Hz / 1,500 rpm ratings in our catalogue.

The sets leave Türkiye by sea. Each one passes a full-load test before it leaves the factory. A commercial invoice and packing list are prepared; a certificate of origin and any other required documents are issued on request.

For a quote, give us a load list or the power, canopy and panel preference, fuel tank and the installation location. Request a quote.

Generator sets being loaded onto a curtain-side trailerGenerator set being loaded with a forklift

Request a quote for Northern Cyprus

Tell us the power, duty, voltage, enclosure and panel you need, plus the site temperature and altitude, and we will work out the right configuration with you.

Request a Quote+90 216 634 34 06WhatsApp

Frequently asked questions

What voltage and frequency should a generator in Northern Cyprus have?

The grid is 50 Hz, 230/400 V. The 50 Hz / 1,500 rpm ratings in our catalogue match this grid directly; we confirm the site voltage at the quotation stage.

How is the rating of a hotel generator calculated?

You look not at the winter load but at the load on July–August evenings: all the air conditioners, the kitchen, the laundry, the lifts, the pool and water pumps. The start of the largest motor is added. In large hotels, running two sets in parallel is more efficient at low load in winter.

How is a generator by the sea protected from corrosion?

Corrosion-resistant surface protection, a position out of the direct salty wind, a well-ventilated canopy and regular maintenance. On the coast, the maintenance interval should not be stretched.

Chat on WhatsApp

Download