ATS and Synchronization Retrofit (Türkiye)
Adding an ATS transfer switch panel or synchronization panel to existing generator systems: compatibility review, fitting, connection and commissioning.

Service request: Send your service request for your generator and our team will contact you. Service request form
Adding an automatic transfer switch (ATS) panel to an existing generator system allows the generator to start automatically when the mains supply fails. A synchronization panel enables several generators to run together and share the load. With this service, we select, fit and commission the panel that suits your existing system.
Scope
- Compatibility review of the existing generator, controller and distribution board
- Selection, fitting and connection of a suitable ATS transfer switch panel
- Fitting a synchronization panel for multiple generators
- Switching to controllers suitable for synchronization, if required
- Testing of transfer and synchronization functions and commissioning
How we work
- Review: The generators, controllers and electrical infrastructure are inspected on site.
- Solution and quotation: The suitable panel and any changes required are presented as a quotation.
- Fitting: The panel is positioned and the connections are made at the scheduled time.
- Commissioning: Transfer and synchronization scenarios are tested and the system is handed over for use.
The scope and conditions of the retrofit depend on the existing system.
Related pages
For a compatibility review and quotation, please get in touch via our contact page.
Frequently asked questions
Can an ATS panel be added to my existing generator?
Yes. The generator's controller, its rating and the facility's main distribution board are reviewed, and a suitable ATS panel is selected and connected to the existing system.
What is needed to run two generators in parallel?
The generators must be equipped with controllers suitable for synchronization and connected to each other via a synchronization panel. The suitability of the existing generators is reviewed first; if necessary, a controller replacement is recommended.
Will there be a power interruption during fitting?
A short interruption may be required while the connections are made. The timing of the work is planned together with you so as to have the least possible impact on the facility's operations.