Turkmenistan – Offshore oil and natural gas facility (Caspian), 1250 kVA

An end-user generator datasheet of 239 lines for a 1250 kVA prime-power set on an offshore platform: we answered every line, sized the set, separated deviations from options, priced 29 offshore option items into one all-inclusive scope and returned a revised, signed datasheet in the customer's own Excel format.

Country
Turkmenistan
Application
Offshore oil and gas wellhead platform, Caspian Sea
Power
1,250 kVA standby / 1,125 kVA prime · 50 Hz
Quantity
1 set
Source of requirements
Written technical specification

Request a quote

Contact us directly

Call +90 216 634 34 06WhatsApp +90 533 582 26 50

We reply in English.

Your request has been received. We will contact you as soon as possible.

Could not send. Please try again or call us. You can also reach us directly: WhatsApp +90 533 582 26 50 · info@terexdiesel.com

Too many submissions in a short time. Please try again in a few minutes.

More details? Use the full request form

The request

Document receivedEnd-user generator datasheet with 239 numbered lines (customer's Excel format), answered in the last column
Requirement categoriesSite conditions, hazardous area, coating, engine, fuel and lubrication, cooling, alternator and excitation, enclosure, fire and gas, switchgear, controls and synchronising, dimensions and weight, type tests
Rating and duty1250 kVA prime, continuous duty from 10 to 100 % load, 110 % for 1 hour
Electrical400/230 V, 50 Hz, 3-phase; voltage ±5 %, frequency ±1 % in steady state
Site conditionsOffshore wellhead platform; ambient −20 to +50 °C, 86 % relative humidity, saline, dusty and corrosive air
Hazardous areaZone 2 location; Zone 2 certified spark arrester, individually Ex-certified (ATEX/IECEx) components
EngineCaterpillar or Perkins; turbocharged and water-cooled; electronic governor (ISO 3046-4); air and fuel shut-off valves; 6 consecutive starts
AlternatorLeroy-Somer, Stamford or Caterpillar; brushless with PMG; class H; IP23 minimum with inlet and outlet filters; marine double-dip varnish; stator RTDs; space heater
Enclosure and coatingCanopy, IP55 with motorised louvres, filtered air inlets, enclosure alarm and space heater; C5-M marine coating
ControlsWoodward easYgen; synchronising for island-mode parallel operation; speed and voltage bias, remote start and volt-free contacts
Fuel autonomyFuel tank on the skid for 8 hours
Standards and testsISO 8528-1, ISO 3046-4, IEC 60034, BS 4999; load, block-load, temperature-rise, insulation-resistance and sound-level tests

The work step by step

  1. 1. Tender specification received

    • The request arrived with the end user's generator datasheet: 239 numbered lines to be answered line by line.
    • The lines cover electrical, mechanical, environmental, hazardous-area, coating, control and documentation requirements.
  2. 2. Specification and project analysis

    • Site: offshore wellhead platform with saline, dusty and corrosive air, −20 to +50 °C and 86 % humidity; at sea level, so no altitude derating.
    • Duty: the datasheet asks for 1250 kVA prime in continuous operation from 10 to 100 % load and 110 % for one hour.
    • Electrical system: 400/230 V, 50 Hz, 3-phase; the set must synchronise with other sets in island mode.
    • Hazardous area: Zone 2. Certification of the whole package is not required; individual components must be Ex-certified (ATEX/IECEx) and the exhaust needs a Zone 2 certified spark arrester.
    • Standards: ISO 8528-1, ISO 3046-4, IEC 60034 and BS 4999.
  3. 3. Product selection

    • Base model TRX P ST 1250: Perkins 4008-30TAG3 engine with a Stamford S6L1D-F4 alternator, 1250 kVA standby / 1125 kVA prime. Its prime rating is below the 1250 kVA prime asked, and we stated this as a deviation.
    • To meet 1250 kVA prime without deviation we also offered TRX P ST 1500 (Perkins 4012-46TWG3A, Stamford S6L1D-H4, 1350 kVA prime) with its own signed datasheet.
    • The buyer preferred the 1250 kVA model; the following work was built on it.
    • Excitation upgraded to PMG with MX321 AVR (±0.5 %); alternator reactances, time constants and short-circuit data taken from the alternator manufacturer's datasheet.
    • +50 °C ambient checked against engine data; the high-ambient rating is marked for confirmation with the engine manufacturer. The alternator inlet filters reduce alternator output by about 5 %, and this is noted on the datasheet.
    • Fuel: the base tank on the skid covers at least 8 hours at 100 % prime.
  4. 4. First offer

    • Base scope: canopy set with base tank, controller, factory load test and documentation.
    • Deviation list: every datasheet line was answered as comply, deviation (in red) or option, so the buyer could see exactly what the base scope covers.
  5. 5. Technical clarification rounds

    • Lead time, factory acceptance test, filter set and spare parts were clarified point by point.
    • Comply: hazardous-area approach with Ex-certified components; factory acceptance test free of charge, witnessed by the buyer or end user; six consecutive starts set in the controller.
    • Deviation kept visible: dry exhaust manifold instead of water-cooled (exhaust insulation added), salient-pole alternator with IC 01 cooling and grease-lubricated bearings, standard turbocharger surface temperature.
    • To be confirmed: ISO 3046-4 class M3 governing, transient limits in the block-load test, 7 h + 1 h temperature-rise test.
  6. 6. Optional items identified and priced

    • 29 option items were extracted from the datasheet in four groups: engine and fuel, alternator, enclosure, control and switchgear.
    • Each item was priced individually and then integrated into one all-inclusive scope at the buyer's request; amounts are not published.
  7. 7. Customer briefing: revised datasheet Rev.1

    • Rev.1 changed 56 lines, each marked in the revision column; all 29 former option lines now marked as included.
    • Remaining deviations stay in red, so the evaluation team sees them openly.
    • The datasheet was returned in the customer's original Excel format plus a signed and stamped PDF.
  8. 8. Delivery and logistics planning

    • Lead time as stated in the offer: 3–4 weeks after order confirmation, plus 1 week reserve for imported option items.
    • Shipping data prepared: approx. 10,800 kg net, 4,900 × 2,500 × 3,500 mm, approx. 42.9 m³; certificate of origin.
  9. 9. Document package

    • Offer, datasheet in the customer's format (signed), catalogue pages, alternator manufacturer's datasheet, factory load-test report sample, warranty terms, start-up and handover form, service forms and operating guide.

Our work

Requirement analysis · Model selection and sizing

  • Every one of the 239 datasheet lines was answered in the customer's last column.
  • Prime rating compared with the requirement: 1125 kVA prime on the base model, 1350 kVA prime on the alternative model.
  • +50 °C ambient and −20 °C cold start checked: jacket water heater and lube oil heater added; high-ambient rating to be confirmed with the engine manufacturer.
  • Fuel autonomy checked against datasheet consumption: base tank on the skid covers at least 8 hours at 100 % prime.
  • Items outside the base scope grouped into 29 options in four groups.

Point-by-point compliance table

ItemRequiredOur proposalAssessment
Rated power1250 kVA prime1125 kVA prime / 1250 kVA standby (TRX P ST 1250); 1350 kVA prime alternative (TRX P ST 1500)Deviation / to be confirmed
Voltage and frequency400/230 V, 50 Hz, 3-phase400/230 V, 50 Hz, 3-phaseComplies
Hazardous areaZone 2; individually Ex-certified componentsEx-certified components; package certification not requiredComplies
Spark arresterZone 2 certifiedZone 2 certified spark arresterWith option
CoatingC5-M marineC5-M offshore coating on canopy and base frameWith option
EnclosureIP55 with motorised louvres, filtered inletsIP55 enclosure, motorised and filtered louvres, space heater, enclosure alarmWith option
Fire and gasDetection with beacon, sounder and flash lightsEx-certified detectors, beacon and sounderWith option
Excitation and AVRPMGPMG + MX321 AVR (±0.5 %)With option
Alternator insulationMarine double-dip varnishMarine double-dip varnish, PT100 stator RTDs, space heaterWith option
Alternator constructionCylindrical rotor, IC 511 cooling, oil-lubricated bearingsSalient-pole rotor, IC 01, grease-lubricated bearingDeviation / to be confirmed
ExhaustWater-cooled manifold, surfaces ≤200 °CDry manifold with thermal insulation of exhaust pipingDeviation / to be confirmed
ControllerWoodward easYgen, synchronisingWoodward easYgen with synchronising, speed and voltage bias terminalsWith option
Output breaker4-pole, motorised, LSIG4-pole motorised breaker with LSIG protectionWith option
Engine safetyAir and fuel shut-off valves, double-sheathed fuel lines, oil mist eliminatorIncluded as optionsWith option
Fuel autonomy8 hours on skidBase tank ≥8 hours at 100 % primeComplies
Governing classISO 3046-4 class M3Electronic governor; class to be confirmedDeviation / to be confirmed
Factory testsLoad, block-load, temperature-rise, insulation, sound levelFactory load test witnessed free of charge; temperature-rise and transient values to be confirmedDeviation / to be confirmed
Spare partsNot in datasheet scopeRecommended list on requestBuyer / local scope

Options identified and priced

  • Air shut-off valve
  • Separate fuel shut-off valve
  • Double-sheathed braided fuel lines
  • Lube oil mist eliminator
  • Oil maintainer with 100 L tank
  • Continuous oil level monitoring (alarm and trip)
  • Lube oil heater
  • Jacket water heater
  • Exhaust thermal insulation (surface ≤200 °C)
  • Spark / flame arrester, Zone 2 certified
  • PMG + MX321 AVR
  • Marine double-dip varnish (winding and exciter)
  • Alternator inlet and outlet filters with dust filter
  • Stator winding PT100 RTDs
  • Alternator space heater
  • IP55 electrical equipment
  • C5-M offshore marine coating
  • IP55 enclosure with motorised louvres
  • Filtered air inlet louvres
  • Enclosure space heater
  • Enclosure alarm system
  • Fire and gas detection with beacon, sounder and flash lights
  • External alarm beacon and sounder
  • Anchor bolts, nuts and washers
  • 4-pole motorised output breaker with LSIG protection
  • Woodward easYgen controller
  • Synchronising for parallel operation
  • External synchronising, voltage bias, speed bias and 24 V DC terminals
  • Individually Ex-certified components (ATEX/IECEx)

Documents prepared · Offer package

  • Commercial offer (line-item structure; prices not published here)
  • Revised datasheet (changed lines marked, signed and stamped, in the customer’s Excel format)
  • Model datasheet
  • Catalogue pages
  • Alternator datasheet
  • Factory load-test report (sample)
  • Warranty terms document
  • Start-up and handover form
  • Maintenance and service forms
  • Operating and maintenance manual
  • Factory load-test report (sample)Factory load-test report (sample)
  • Warranty terms documentWarranty terms document
  • Start-up and handover formStart-up and handover form
  • Datasheet returned in the customer's original Excel format, last column completed, plus a signed and stamped PDF.
  • Deviations highlighted in red; every line marked as comply, deviation, included or to be confirmed.
  • A separate signed datasheet was prepared for the 1350 kVA prime alternative.

Proposed solution

TRX P ST 1250

Standby power1,250 kVA / 1,000 kW
Prime power1,125 kVA / 900 kW
Voltage · Frequency · Speed230/400 V · 50 Hz · 1,500 rpm
EnginePerkins 4008-30TAG3 · 30.5 L
AlternatorStamford S6L1D-F4 · AVR MX341B · IP23/H
Fuel consumption · At 75% load188 L/h
Fuel consumption · At 100% load244 L/h
Dimensions (L × W × H) (Open type)4,900 × 2,200 × 2,570 mm · 8,390 kg

Values are taken from the model’s datasheet; the full datasheet and catalogue page are on the model page.

Offered configuration

  • Woodward easYgen controller with synchronising for island-mode parallel operation
  • PMG + MX321 AVR, marine double-dip varnish, PT100 stator RTDs, alternator space heater
  • IP55 canopy with motorised and filtered louvres, C5-M offshore coating
  • Fire and gas detection, Zone 2 spark arrester, air and fuel shut-off valves
  • 4-pole motorised output breaker with LSIG protection

Alternative configurations

  • TRX P ST 1500 – Perkins 4012-46TWG3A, 1,500 kVA standby / 1,350 kVA prime

Packing, shipping and export documents

  • Lead time as stated in the offer: 3–4 weeks after order confirmation, plus 1 week reserve for imported option items.
  • Shipping data: approx. 10,800 kg net, 4,900 × 2,500 × 3,500 mm, approx. 42.9 m³.
  • Export documents: commercial invoice, packing list, certificate of origin, factory test report.

Customer, tender and site names are withheld; only the country is shown. Prices and commercial terms are not published. Customer documents are not shared; requirements are summarised in our own words.

How we work with your specification

  1. Send the specification, datasheet form or list of needs (PDF, Excel, Word or a message).
  2. We reply on the same working day and ask about missing or unclear points.
  3. We size the power (prime/standby), voltage, frequency, ambient conditions and autonomy, select the model and prepare a point-by-point compliance table. Deviations and options are stated openly.
  4. We send the package — offer, datasheet, catalogue pages and any forms requested; for standard configurations within 24 hours.